PROJECT ACTIVTIES
1
Geological survey data interpretation Geological Seismic Survey
PROJECT ACTIVTIES
2
Management of geological database Reprocessing and archiving of retrospective seismic data
PROJECT ACTIVTIES
3
3D modeling Conducting 2D/3D seismic surveys (1С, 2С, 3С, 4С)

PERFORMANCE OF 2D AND 3D CDPM FIELD SEISMIC OPERATIONS

3D acquisition: swathe acquisition geometry, Q-Marine Gel towed streamers, 12 streamers by 480 channels each, distance between the channels: 12.5 m., distance between the streamers: 100 m, recording length: 10 seconds.